The Punjab School – Canal Garden Campus

A purpose-built campus designed around teaching.

Status
Completed
Area / Scale
42,000 sq ft Built-Up
Duration
20 Months
Start Date
February 2018
Completion
October 2019
Client
The Punjab School
About the Campus

A purpose-built campus delivered for The Punjab School.

The Canal Garden campus of The Punjab School was constructed by LEHNAY GROUP from structure through to final finish. The building was planned around daylit classrooms, wide corridors sized for peak movement between periods, science and computer laboratories, a library and a multipurpose hall, all delivered inside an academic calendar so the campus could open on time.

Structure, gray and finishing works for a complete school campus delivered for The Punjab School, RCC frame, masonry and plaster, floor and wall finishes, joinery, coordinated electrical, data and ventilation services, sanitary blocks, and external works including play areas and boundary treatment.

  • Daylit classrooms with cross ventilation
  • Science and computer laboratories
  • Wide corridors and code-compliant escape routes
  • Low-maintenance finishes for intensive daily use
Completed Project

Delivered, documented and handed over.

Completed & Handed Over

Status: Completed

The Punjab School was completed, tested and handed over to the client in full.

Defects Liability Cleared

Post-handover

The maintenance period was served and all snag items closed out.

Records Available

Documentation

As-built drawings, test records and completion certificates are on file.

Share your details and the project team will respond with the full information pack.

Request Project Details
Academic spaces

What the campus contains

Classrooms

Naturally lit teaching spaces with cross ventilation and smart-board provision.

Science Laboratories

Physics, chemistry and biology labs with service benches and safety fittings.

Computer Lab & Library

Networked computer lab and a reading library on the upper floor.

Activity & Sports Areas

Assembly hall, activity room and an open play area.

Layout

Floor plans

The approved layout showing the arrangement of the built areas, circulation and services across the site. Full-size drawings are shared on request.

Execution

How the work was delivered

Survey & Setting Out

Topographic survey, level control and setting out against the approved drawings.

Material Approval

Every material source approved and tested before it reached site.

Stage Inspection

Each stage signed off in the inspection register before the next began.

As-Built Records

Drawings updated to as-built condition and issued at handover.

On site

Facilities and provisions

Boundary & Access

Defined site access, boundary treatment and controlled entry.

Utilities at Boundary

Water, power and drainage brought to the boundary of every unit.

Lighting

Street and area lighting on the completed sections.

Maintenance

A maintenance regime handed to the client at completion.

Campus Facilities

Purpose-built learning spaces.

Science laboratories
Computer lab
Library
Assembly hall
Play area
Cafeteria
CCTV coverage
Backup power
Clean drinking water
Medical room
Construction Progress

Where the project stands today.

All packages are complete, tested and handed over.

Earthworks & Substructure100%
Structure / Pavement100%
Services & Utilities100%
Finishes & Handover100%
Timeline

Delivery milestones.

  1. February 2018

    Mobilisation

    Site establishment, survey, setting out and material approvals.

  2. Stage 1

    Substructure & Earthworks

    Excavation, foundations and formation-level works completed and tested.

  3. Stage 2

    Main Works

    Structure, pavement and primary civil works executed under stage inspection.

  4. Stage 3

    Services & Utilities

    Sewerage, water, electrical and mechanical services installed and tested.

  5. October 2019

    Finishing & Handover

    Finishes, snagging, testing and handover with as-built records.

Gallery

Around the campus.

Overview

The Punjab School – Canal Garden Campus – video overview.

The Punjab School – Canal Garden Campus – Overview

Site imagery

The Punjab School on site

FAQs

Questions, answered.

The Punjab School – Canal Garden Campus is located at Canal Garden, Lahore. The map on this page shows the exact pin, and the directions button opens it in Google Maps.

Location

Canal Garden, Lahore

Canal Garden, LahoreGet Directions
Admissions & enquiries

Ask the campus a question.

Share your details and the project team will get back to you with the information you need.

LEHNAY GROUP
Engineering integrity. Delivered on time.

Our teams execute civil, structural, MEP and finishing scopes for private developers, institutions and public clients across housing, education, healthcare, religious, commercial, industrial and infrastructure sectors.

Canal Garden, Lahore
Educational