LEHNAY.
Jamia Masjid Khalid Bin Waleed
All developments
CompletedReligiousCanal Valley, Lahore

A place of worship at the heart of the community

Jamia Masjid Khalid Bin Waleed

A masjid built to serve every prayer, every day.

Status
Completed
Area / Scale
12,000 sq ft
Duration
22 Months
Start Date
September 2019
Completion
July 2021
Client
Canal Valley Welfare Trust
Project Overview

Canal Valley's principal masjid, complete and in daily use.

Jamia Masjid Khalid Bin Waleed is the principal place of worship in Canal Valley. The masjid was built from foundation to final finish by LEHNAY GROUP: a clear-span main prayer hall free of internal columns, a dome and minaret executed in reinforced concrete with stone cladding, a dedicated ladies' section with separate access, and a shaded courtyard used for Jumu'ah and Eid congregations.

Complete structure, gray and finishing works, RCC foundations and frame, clear-span roof over the main hall, dome and minaret construction, marble flooring and cladding, timber joinery, calligraphy panel interfaces, acoustic sound system, cooling and ventilation, and wudhu facilities with drainage and hot-water provision.

  • Column-free main prayer hall
  • Dome and minaret in RCC with stone cladding
  • Separate ladies' prayer section and access
  • Courtyard configured for Jumu'ah and Eid
Completed Project

Delivered, documented and handed over.

Complete & In Use

Completed

The masjid was delivered turnkey and serves the Canal Valley community across all five daily prayers.

Column-Free Hall

Structure

A 62 ft clear span keeps sight lines to the mihrab uninterrupted across the main prayer hall.

Ladies' Section

Separate access

A separate ladies' prayer area with its own entrance, wudhu facilities and audio feed.

Jumu'ah Overflow

1,450 total

The shaded courtyard and side arcades absorb Jumu'ah and Eid congregations beyond hall capacity.

Receive the completion report, imagery and technical details.

Request Project Dossier
Architecture

How the masjid was built.

Clear-Span Roof

A post-tensioned RCC roof carries the main hall without internal columns, keeping the qibla wall fully visible.

Dome & Minaret

Reinforced concrete dome and minaret finished in stone cladding, with a mosaic band at the dome collar.

Mihrab & Qibla Wall

Marble-clad mihrab with a recessed calligraphy panel and indirect lighting to the qibla wall.

Arcaded Courtyard

A colonnaded arcade shades the courtyard perimeter and links the main hall to the ablution block.

Prayer Areas

Where the congregation prays.

Ground

Main Prayer Hall

Capacity 820

Column-free carpeted hall with the mihrab and mimbar on the qibla wall and clerestory daylight above.

First floor

Ladies' Section

Capacity 180

Screened first-floor gallery with a separate stair, wudhu area and its own audio feed.

Open air

Courtyard

Capacity 350

Shaded open courtyard used for Jumu'ah overflow and both Eid congregations.

Covered

Side Arcade

Capacity 100

Colonnaded arcade along the courtyard edge, matted for overflow rows in all weather.

Finishing Works

The finishing scope delivered.

Marble Flooring

Polished marble to the courtyard and arcades, with carpeted rows marked in the main hall.

Timber Joinery

Hardwood entrance doors, mimbar and screen panels to the ladies' gallery.

Acoustics & Sound

Absorptive ceiling treatment with a distributed speaker system tuned for congregational clarity.

Cooling & Ventilation

Ceiling fans, evaporative cooling and high-level louvres for cross ventilation in summer.

Amenities

Built for comfort and dignity.

Column-free main prayer hall
Separate ladies' prayer section with dedicated entrance
42-station ablution block with winter hot water
Shaded arcaded courtyard
Marble flooring throughout the courtyard and arcades
Distributed sound system tuned for the hall
Evaporative cooling and ceiling fans
Shoe racks at all three entrances
Wheelchair-accessible ramp at the main entrance
Madrasah room for after-Asr Qur'an classes
Facilities

Facilities on the masjid grounds.

Ablution Block

42 stations

Wudhu stations with hot water in winter, drained on a dedicated soakaway line.

Madrasah Room

Two classes

Ground-floor room used for after-Asr Qur'an classes for children of the phase.

Imam's Residence

Two rooms

Self-contained quarters at the rear of the plot with independent access.

Janazah Facility

On site

A dedicated ghusl room with cold storage provision adjoining the rear courtyard.

Construction Progress

Where the project stands today.

All packages were completed and the masjid was handed over ready for congregational use.

Foundations & RCC Frame100%
Clear-Span Roof100%
Dome & Minaret100%
Marble & Finishing Works100%
Sound, Cooling & Commissioning100%
Gallery

The masjid in detail.

Video

Inside the masjid.

Main hall, dome and courtyard

A walk from the courtyard arcade through to the mihrab, showing the clear-span roof and dome interior.

Timeline

Construction milestones.

  1. Phase 1

    Foundations & frame

    Excavation, raft foundation and the reinforced concrete frame to hall level.

  2. Phase 2

    Clear-span roof

    Post-tensioned roof cast over the main hall, removing all internal columns.

  3. Phase 3

    Dome & minaret

    Dome shell and the 88 ft minaret constructed and clad in stone.

  4. Phase 4

    Finishing works

    Marble flooring and cladding, timber joinery, mihrab detailing and painting.

  5. Phase 5

    Services & handover

    Sound system, cooling, lighting and ablution facilities commissioned before handover.

FAQs

Questions, answered.

1,450 in total, 820 in the main hall, 180 in the ladies' section, 350 in the courtyard and 100 in the side arcade.

Location

Canal Valley, Lahore

Canal Valley, LahoreGet Directions
Contact

Enquire or contribute.

LEHNAY GROUP
Engineering integrity. Delivered on time.

Our teams execute civil, structural, MEP and finishing scopes for private developers, institutions and public clients across housing, education, healthcare, religious, commercial, industrial and infrastructure sectors.

Canal Valley, Lahore
Religious