Educational · University of Lahore
Allied Health Sciences Department
A purpose-built campus designed around teaching.
A teaching and laboratory block for allied health sciences.
The Allied Health Sciences Department at the University of Lahore was built by LEHNAY GROUP from structure through to final finish. The building houses teaching laboratories, demonstration rooms and faculty offices, with services planned around laboratory requirements, fume extraction routes, laboratory drainage and heavier power provision than a standard academic block.
Structure, gray and finishing works for an academic and laboratory building, RCC frame, masonry and plaster, chemical-resistant laboratory finishes, laboratory drainage and extraction provisions, electrical and data distribution, joinery and sanitary blocks.
- Teaching laboratories with specialist services
- Chemical-resistant laboratory finishes
- Laboratory drainage and extraction routes
- Faculty offices and demonstration rooms
Delivered, documented and handed over.
Completed & Handed Over
Allied Health Sciences Department was completed, tested and handed over to the client in full.
Defects Liability Cleared
The maintenance period was served and all snag items closed out.
Records Available
As-built drawings, test records and completion certificates are on file.
Share your details and the project team will respond with the full information pack.
Request Project DetailsWhat the campus contains
Classrooms
Naturally lit teaching spaces with cross ventilation and smart-board provision.
Science Laboratories
Physics, chemistry and biology labs with service benches and safety fittings.
Computer Lab & Library
Networked computer lab and a reading library on the upper floor.
Activity & Sports Areas
Assembly hall, activity room and an open play area.
Technical details.
Execution programme.
- March 2019
Mobilisation
Site establishment, survey, setting out and material approvals.
- Stage 1
Substructure & Earthworks
Excavation, foundations and formation-level works completed and tested.
- Stage 2
Main Works
Structure, pavement and primary civil works executed under stage inspection.
- Stage 3
Services & Utilities
Sewerage, water, electrical and mechanical services installed and tested.
- July 2020
Finishing & Handover
Finishes, snagging, testing and handover with as-built records.
Work executed on site.
University of Lahore
Tell us about the work you need done.
Share the basics of your own project and our contracts team will respond with a suggested approach, programme and budget estimate.
Our teams execute civil, structural, MEP and finishing scopes for private developers, institutions and public clients across housing, education, healthcare, religious, commercial, industrial and infrastructure sectors.