LEHNAY.
Lahore Business School
All portfolio projects
CompletedEducationalClient: University of Lahore

Educational · University of Lahore

Lahore Business School

A purpose-built campus designed around teaching.

Status
Completed
Area / Scale
18,000 sq ft
Duration
14 Months
Start Date
June 2015
Completion
July 2018
Client
University of Lahore
Project Overview

Structure and gray works for the Lahore Business School.

For the Lahore Business School at the University of Lahore, LEHNAY GROUP delivered the structural and gray works. The frame was designed and built to carry large lecture theatres and open-plan teaching floors, with long spans and coordinated openings for the services that would follow in the fit-out stage.

Structure and gray works, RCC foundations, columns, beams and slabs with long-span framing for lecture theatres, masonry infill, plaster, blockwork and service openings coordinated with the follow-on finishing and MEP packages.

  • Long-span framing for lecture theatres
  • Open-plan teaching floors
  • Service openings coordinated in advance
  • Structure and gray works to handover
Completed Project

Delivered, documented and handed over.

Completed & Handed Over

Status: Completed

Lahore Business School was completed, tested and handed over to the client in full.

Defects Liability Cleared

Post-handover

The maintenance period was served and all snag items closed out.

Records Available

Documentation

As-built drawings, test records and completion certificates are on file.

Share your details and the project team will respond with the full information pack.

Request Project Details
Academic spaces

What the campus contains

Classrooms

Naturally lit teaching spaces with cross ventilation and smart-board provision.

Science Laboratories

Physics, chemistry and biology labs with service benches and safety fittings.

Computer Lab & Library

Networked computer lab and a reading library on the upper floor.

Activity & Sports Areas

Assembly hall, activity room and an open play area.

Specifications

Technical details.

Structure
RCC frame with brick masonry infill
Classrooms
20 teaching spaces with cross ventilation
Laboratories
Physics, chemistry, biology and computer labs
Circulation
Double-loaded corridors with two protected staircases
Safety
Fire extinguishers, alarm points and CCTV coverage
Programme

Execution programme.

  1. June 2015

    Mobilisation

    Site establishment, survey, setting out and material approvals.

  2. Stage 1

    Substructure & Earthworks

    Excavation, foundations and formation-level works completed and tested.

  3. Stage 2

    Main Works

    Structure, pavement and primary civil works executed under stage inspection.

  4. Stage 3

    Services & Utilities

    Sewerage, water, electrical and mechanical services installed and tested.

  5. July 2018

    Finishing & Handover

    Finishes, snagging, testing and handover with as-built records.

Gallery

Work executed on site.

Location

University of Lahore

University of LahoreGet Directions
Hire us as your contractor

Tell us about the work you need done.

Share the basics of your own project and our contracts team will respond with a suggested approach, programme and budget estimate.

LEHNAY GROUP
Engineering integrity. Delivered on time.

Our teams execute civil, structural, MEP and finishing scopes for private developers, institutions and public clients across housing, education, healthcare, religious, commercial, industrial and infrastructure sectors.

University of Lahore
Educational