Shahida Girls Hostel

Purpose-built institutional space, delivered complete.

Status
Completed
Area / Scale
45,000 sq ft
Duration
14 Months
Start Date
August 2021
Completion
July 2023
Client
University of Lahore
Project Overview

A girls' hostel built from structure to finish.

Shahida Girls Hostel at the University of Lahore was constructed by LEHNAY GROUP through structure, gray and finishing stages. The building combines residential rooms with communal dining, study and laundry facilities, secure single-point entry and warden accommodation positioned to oversee access.

Complete structure, gray and finishing works for a residential hostel, RCC frame, masonry and plaster, floor and wall finishes, joinery, sanitary blocks with high-demand hot and cold water, electrical and ventilation services, and communal dining, study and laundry areas.

  • Residential rooms with communal facilities
  • Secure single-point controlled entry
  • Sanitary blocks sized for peak demand
  • Warden accommodation overseeing access
Completed Project

Delivered, documented and handed over.

Completed & Handed Over

Status: Completed

Shahida Girls Hostel was completed, tested and handed over to the client in full.

Defects Liability Cleared

Post-handover

The maintenance period was served and all snag items closed out.

Records Available

Documentation

As-built drawings, test records and completion certificates are on file.

Share your details and the project team will respond with the full information pack.

Request Project Details
Facility spaces

What the building contains

Teaching / Working Halls

Large-span halls with natural light on both faces.

Offices & Admin

Administration offices, records room and reception.

Support Spaces

Pantry, stores, washrooms and service rooms on every floor.

Circulation

Central corridors with two protected staircases and lift provision.

Specifications

Technical details.

Structure
RCC frame with masonry infill
Built-up Area
45,000 sq ft over multiple floors
Circulation
Central corridor with two protected staircases
Services
Electrification, plumbing, HVAC provisions and firefighting
Finishes
Tiled flooring, aluminium windows and painted surfaces
Programme

Execution programme.

  1. August 2021

    Mobilisation

    Site establishment, survey, setting out and material approvals.

  2. Stage 1

    Substructure & Earthworks

    Excavation, foundations and formation-level works completed and tested.

  3. Stage 2

    Main Works

    Structure, pavement and primary civil works executed under stage inspection.

  4. Stage 3

    Services & Utilities

    Sewerage, water, electrical and mechanical services installed and tested.

  5. July 2023

    Finishing & Handover

    Finishes, snagging, testing and handover with as-built records.

Gallery

Work executed on site.

Location

University of Lahore

University of LahoreGet Directions
Hire us as your contractor

Tell us about the work you need done.

Share the basics of your own project and our contracts team will respond with a suggested approach, programme and budget estimate.

LEHNAY GROUP
Engineering integrity. Delivered on time.

Our teams execute civil, structural, MEP and finishing scopes for private developers, institutions and public clients across housing, education, healthcare, religious, commercial, industrial and infrastructure sectors.

University of Lahore
Institutional